Description: Reclus18_46 1893 Reclus print RAILWAY LIMA TO LA OROYA AT CHICLA, PERU, #46 Nice view titled Chemin de fer de Lima a La Oroya. - vue prise a Chicla, from wood engraving with fine detail and clear impression, approx. page size 27.5 x 17.5 cm, approx. image size is 19 x 13 cm. From La Nouvelle Géographie universelle, la terre et les hommes, 19 vol. (1875-94) (edition in English: The Earth and Its Inhabitants, 1878-94), great work of Elisee Reclus. Ferrocarril Central Andino Ferrocarril Central Andino (FCCA) is the consortium which operates the Ferrovías Central railway in Peru linking the Pacific port of Callao and the capital Lima with Huancayo and Cerro de Pasco. As one of the Trans-Andean Railways it is the second highest in the world. Route The line starts at the port city of Callao and goes through Lima and the Desamparados station parallel to the Rímac River. It crosses into Junín state via the Galera Tunnel, the highest railroad tunnel in the world. It reaches La Oroya, where it splits in two: the southern branch goes to Huancayo, while the northern branch (previously a line operated by a mining company) goes into Pasco region, through Cerro de Pasco (the regional capital) to the Goyllarisquizga coal mines. Formerly a branch split off at Cerro de Pasco and ran into Pachitea Province in Huánuco region. There are 27 stations. History In 1851, engineer Ernest Malinowski proposed to extend the newly-opened Lima to Callao railroad as far as the valley of Jauja. Malinowski, a Polish expatriate, was voluntarily exiled in Peru by political problems in his country, occupied at that time by Germany, Russia and Austria. The government commissioned Felipe Barreda, Mariano Felipe Paz Soldán, and Manuel Marrón to report in detail on the project. This commission devised a detailed plan for the railroad which, after approval by the Peruvian Congress, was integrated with the Malinowski proposal. The Peruvian Congress named a new commission to make recommendations on alternate construction plans. This second commission delivered a meticulous report of the four possible routes that it had explored and evaluated: By the gorge of the Rímac River, starting in Lima and proceeding through Matucana, San Mateo and Tarma. By the gorge of the Chillón River, from Lima, through Horseman, Yangas, Obrajillo, Casachanca and Carhuacancha Along the Chancay River, from Lima, through Chancay, Macas, Huamantanga, Huaillay and Cerro de Pasco Along the Lurín River, from Lima, through Lurín, Sisicaya, Tupicocha, San Damián, Tuctucocha, Pumacocha, Basket, Tarma and Jauja. According to the report, construction of the proposed line was possible but difficult by the Rímac gorge, almost impossible by the Chillón gorge, impossible by the Chancay, but very easy by the Lurín. This last option was the choice of engineer Gerrit Backus, reputed to be one of the most able professionals in the design and construction of railway routes. This third phase lasted until March 1866 when work stopped due to the war with Spain. In 1868, Don Diego Masías brought in Henry Meiggs, a North American who had been a contractor in both New Jersey and in Chile, who had been working in Chile. The audacious Meiggs, after some negotiation, appeared before the government on 21 September of that year proposing to design and construct a railroad between Lima and Jauja. Meiggs reportedly told the government, "I will place rails there, where the llamas walk." The studies were approved and, with a construction budget that had climbed to 27 million pounds, Meiggs' proposal was accepted. The contract specified that work had to be completed within six years and would be financed by the sale of special bonds, with an annual interest of 6% and amortization of 2% ten years after their sale. The contract was finalized and signed on December 23, 1869. Construction began in January 1870 with an elaborate ceremony in which the first stone in the Monserrate station in Lima was placed. The work began under the direction of Malinowski, head of the Technical Body, and fellow Polish engineer Edward Jan Habich. The Callao, Lima & Oroya Railway opened to Chicla by 1878 and reached La Oroya by 1893 and Huancayo (346 km (215 mi)) in 1908. It is the second highest railway in the world (following opening of the Qingzang railway in Tibet), with the Galera summit tunnel under Mount Meiggs at 4,783 m (15,692 ft) and Galera station at 4,777 m (15,673 ft) above sea level, requiring constructional feats including many switchbacks and around sixty each tunnels and steel bridges. In 1923 a branch was opened from Ticlio (making it the world's highest junction) to Morococha via La Cima (4,818 m (15,807 ft) above sea level), from where in April 1955 a spur line opened to Volcán Mine, reaching an (at the time) world record altitude of 4,830 m (15,850 ft). Both branch and spur have since closed to traffic.
Price: 21.99 USD
Location: Zagreb, HR
End Time: 2024-11-27T08:22:47.000Z
Shipping Cost: 8.5 USD
Product Images
Item Specifics
Return shipping will be paid by: Buyer
All returns accepted: Returns Accepted
Item must be returned within: 30 Days
Refund will be given as: Money Back
Style: Realism
Type: Print
Year of Production: 1893
Print Type: Engraving
Size Type/Largest Dimension: Small (Up to 14'')
Listed By: Dealer or Reseller
Date of Creation: 1800-1899
Original/Reproduction: Original Print