Description: Emulsion pump High Shear Emulsifying Pump 110V 2.2KW Application: Biological medicine, food industry, cosmetic care,ink coating, nano materials, petrochemical, printing and dyeing auxiliaries,paper making, pesticides and chemical fertilizers, plastics, rubber,and other fine chemical mixing, dispersion and emulsification. Forbidden to run in empty and reversal !!!!! Specification: power:2.2KW Voltage:110V Frequency:60HZ Speed:2900r/min Flow range:3t/h N-d:φ4-16mm Inlet:38mm (1.5") outlet:32mm (1.25") Ball valve:1/2" Material:304 food grade stainless steel Attention: 1.Check whether the import and export seal is good, there are no impurities, metal chips and other materials that have damaged equipment into the body. 2.Check whether the motor and the machine are in good condition when the transportation is out of the warehouse. When the power switch is connected, a safe contact motor device should be installed. 3.Before the connection between the import and export process pipe and the process pipe, first, clean the process pipeline, and ensure that the process pipeline without welding slag, metal chips, glass chips, quartz sand and other damaged equipment can be connected with the machine after the hard material. 4.The selection of the installation position of the TRL1 pipeline equipment and the nearest location of the container are such as the bottom of the container. The pipeline must be simple and direct, as far as possible to reduce the components of the elbow pipe, thus reducing the resistance of the material in the circulation process. 5.The choice of location for intermittent equipment installation is suitable for vertical level of containers. When dumping, it must be well sealed, moisture-proof, moisture proof, dust-proof and explosion-proof. 6.Before starting the machine, first, turn the spindle, the hands feel the light and heavy, flexible, no other frictional sound and abnormal sound. 7.When installing the pipeline, the inlet and outlet pipe adopts the clamp live connection structure. 8.After the completion of the above work, the power supply is started, and the steering axis of the motor steering axis is checked and checked repeatedly. Maintain: 1. The cooling water is usually connected before the machine is opened, and the cooling water is shut down first and then the cooling water can be used. 2.The cooling water pressure is less than 0.2Mpa 3.The material must enter the working chamber, and it can be switched on. It is also necessary to ensure that it does not run in the condition of material failure, so as to avoid idling and cause mechanical seals (machinAdd a current protector when wiring the emulsion pump.burn out or affect service life. 4.Add a current protector when wiring the emulsion pump. Important: After confirming the sealing of the cooling water, the motor is started, and the motor steering should be operated with the steering sign of the main shaft, and the reversal is strictly prohibited! Item Number: 022709 Shipping & Handling ▲ Default shipping cost or free shipping service is only for the lower 48 United States by UPS Ground or USPS. Other areas or needs other shipping ways, please contact us. ▲ 6 months' warranty for the machines, not for the consumables. We stand behind our products all the item, so even if your warranty period has expired, you can still seek for service or technical support from us with low cost. Handling Time: Shipping is usually made in 1-3 business days after payments cleared. Orders are processed from Monday-Friday; Not on the weekends & public holidays. Sales tax / Customs duties: Collected by ebay. Return / Refund Returns & Exchanges ▲ All returns should be made within 30 days of delivery date. Items must be in unused condition, with all original materials included with the shipment. A partial refund may be applied for opened or damaged items, depending on the condition. ▲ Items returned under the buyer’s remorse: The return shipping fee must be covered by the buyer; The original shipping cost will also be deducted from the refund. 15-30% restocking fee of the items purchase price will be charged. Defective & Damaged Products ▲ If product was received damaged or not as described, please send us some pictures or videos, so we could well understand your problem, then solve them for you ASAP. Besides, it's much helpful for us to claim with UPS, remind our related department to pay much more attention to packaging later on. Hope for your understanding. On Sep 6, 2024 at 22:43:36 PDT, seller added the following information:
Price: 1375.05 USD
Location: Rancho Cucamonga, California
End Time: 2024-11-07T15:20:01.000Z
Shipping Cost: 0 USD
Product Images
Item Specifics
Restocking Fee: No
Return shipping will be paid by: Buyer
All returns accepted: Returns Accepted
Item must be returned within: 30 Days
Refund will be given as: Money Back
Brand: TECHTONGDA
MPN: 022709